Cooling tower with turnkey service, including the dismantling of the old cooling tower

The Customer Problem

It is September 2023 when Decsa's Service team is contacted by a major therapeutic recovery community based in Cormano di Rimini, RN, to receive assistance on a dated cooling tower.

The customer had an old cooling tower not manufactured by Decsa that was intended for cooling the motor of their cogenerator. A careful inspection by Decsa's Service team served to analyze the situation, and by carefully assessing the condition of the tower, it became clear that extraordinary maintenance would not be sufficient to restore the correct operation of equipment, and that replacement of the tower was a necessary condition to ensure its regular use.

The solution: a new turnkey cooling plant

Taking note of the situation, the Client thus requested a turnkeyservice, i.e., a complete service, including the following activities:

  • The dismantling of the pre-existing cooling tower
  • The disposal of equipment at the disposal center
  • Piping upgrading, i.e., dismantling the previous piping and setting up the new piping to the manifold
  • The installation of the new cooling tower
  • the start-up of the equipment

Based on the customer's needs, and the characteristics of the previously installed tower, Decsa offered a closed-circuit cooling tower REF-C 005 with several agreed-upon optional extras: three-probe control for automatic make-up, Electric heater - 20°C, control thermostat for the basin electric heater, and our special DecsaCOATING PLUS interior and exterior protective coating with RAL 5014.

Project timelines

The work, awarded by the Client in February 2024 with delivery by the end of May 2024, was completed on schedule and was carried out by Decsa's Sales & Service team in collaboration with a service center in the Milan area.

Company Recovery community
Year of Installation 2024
Place of Installation Cormano di Rimini (RN), Italy
Type of interlocutor End Client
Application HVAC
Fluid Water
Input temperature 43°C
Output temperature 39,5°C
Wet Bulb 27°C
Power required 144 kW
equipment provided Cooling tower REF-C-005 a closed-circuit
Services Provided - Consulting
- Dismantling of pre-existing tower
- Disposal of equipment
- Piping
- Installation of a new cooling tower
- Startup of the equipment