In July 2023 we were contacted by a long-standing customer of ours specializing in solid waste recovery for the inspection of 4 Decsa fibreglass cooling towers installed in Marghera (VE) in 1991. A careful analysis by Decsa's Service technicians revealed that the equipment, now dated but still functional, needed major modernization (revamping).
In agreement with the Client-who did not want to replace cooling towers but preferred to perform maintenance on the existing equipment -Decsa proposed an almost complete revamping of equipment (except for the motors, fans, and fiberglass top cover).
The revamping activities of the four cooling towers involved, for each unit:
The work also required a great deal of effort on the part of our technical department, which had to rethink and redesign the entire distribution system. In fact, in order to improve the efficiency of cooling towers and avoid the severe corrosion cost in the original (metal) distribution system, we opted to replace it with the current PVC one and add the new DecsaSpray* nozzles.
*DecsaSpray is the new nozzle designed by Decsa that enables full-cone water spraying, ensuring total spraying of the fill pack.
The order was finalized in October 2023, while the execution of the revamping work, which took place on schedule, was agreed upon in the weeks between the end of February and March 2024, a period in which the Customer had planned the entire plant downtime to allow for various maintenance activities, including the cooling towers.
The activity, supervised by our area agency Tekimp Sas, was coordinated and completed by our Service technicians. In the gallery you can see the various removal and replacement activities carried out during the intervention.
Company | Company specializing in recovery and preparation for recycling of solid waste |
---|---|
Year of Installation | 1991 |
Year of Intervention | 2024 |
Place of Installation | Marghera (VE), Italy |
Type of interlocutor | End Client |
Application | Industrial waste cooling |
Fluid | Water |
equipment provided | TVA 450 fiberglass cooling tower |
Services Provided | Revamping work with replacement of: - Exchange packs - drift eliminators - Air intakes - Nozzles - Main collectors - Secondary collectors - Panels and Portal |
Are your equipment also in need of modernization? Decsa's Service team can revamp and retrofit activities on evaporative cooling towers and condensers, even those not manufactured by us. Contact us for more information.
Decsa Srl
Via Cappelletta 1
Voghera (PV) - Italy
+39 0383 69411
P.I. IT08325980152